[vc_row][vc_column width=”1/2″][vc_column_text]Environmentally Friendly, Fully contained, operationally safe and good for the community
GAS TURBINES
Kawasaki Machines you can count on
Kawasaki gas turbine generator sets are specifically designed with performance and reliability in mind to improve heat rate, minimize maintenance and avoid costly downtime. They come in a range from 1.4 to 15 MW electric generations at ISO conditions. Its high performance ignition system ensures a starting reliability of 99.4% or more, even in cold weather conditions and offers the options to produce steam saturated and superheated steam through a HRSG for cogeneration applications and reduce payback terms.
Suministro GPB80 proyecto Colombia con HRSG (en proceso).[/vc_column_text][/vc_column][vc_column width=”1/2″][vc_column_text][/vc_column_text][/vc_column][/vc_row][vc_row][vc_column width=”1/2″][vc_column_text]Mobile Cogeneration Unit (MCU)
Quintal – Barranquilla 2.5 MW en operación desde Enero 2.012.
Propasa, Monterrey Mexico; 7.5 MW y 70,000 lbs vapor.
The Mobile Cogeneration Unit is a Unique compact product, fully automated, trailer mounted unit (option) contains two (2) independently operable Kawasaki gas turbines with shaft-driven generators and a supplementary fired heat recovery steamgenerator (HRSG). Net output is 3.0 MW of electricity at ISO conditions and more than 12,000 Kg/Hr of Highpressure (Saturated or Superheated). You can use this residual Steam for process, Hot water or Chilled- water with an absorption chiller.
The MCU is available at 4160V-3-60 configuration using natural gas. Steam injection is used for NOx control.
Electric output @ 4160 VAC (in Kw) 3,168 ISO conditions
Fuel input (in Kg-cal/hr – LHV) 14,21
Steam output (in Kg per hour)
Saturated (17.8 kg/cm2 -208 ºC to 29.5 kg/cm2 – 233 ºC) 13,400
Superheated (17.8 kg/cm2 – 280 ºC to 29.5 kg/cm2-305 ºC) 12,100
Turbine inlet 990 ºC
Exhaust gas temperature 518 ºC
—
In addition to this outstanding device, we can supply other
Gas Turbines w/o HRSG ranging
from 60 to 2000 Kw and small
steam turbines.[/vc_column_text][/vc_column][vc_column width=”1/2″][vc_column_text][/vc_column_text][vc_column_text][/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]Algunos proyectos con MCU instalados por Seisa:
- Quintal – Barranquilla 2.5 MW en operación desde Enero 2.012.
- Propasa, Monterrey Mexico; 7.5 MW y 70,000 lbs vapor.
[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column width=”1/3″][vc_column_text][/vc_column_text][/vc_column][vc_column width=”1/3″][vc_column_text][/vc_column_text][/vc_column][vc_column width=”1/3″][vc_column_text][/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][/vc_column][/vc_row]